Why the quote is not the cost
Buyers in Egypt often receive proposals from suppliers in Europe, Asia and North America. One quotes ex-works, another delivered to Alexandria, Port Said or Sokhna, a third includes installation. Total landed cost puts every proposal on the same basis, so you compare what each option really costs on your factory floor.
The cost lines
- Equipment price: robot, tooling, fixtures, controls and safety
- Engineering and programming
- Factory acceptance test at the supplier, including your travel to attend
- Export packing and crating (ISPM 15-compliant wood for crates and pallets)
- Export clearance and transport to the port of loading
- Ocean or air freight to Alexandria, Port Said or Sokhna, and cargo insurance
- Port charges, customs brokerage and any conformity certificate
- Import duty and taxes in Egypt
- Inland transport to your site, rigging and placement
- Installation, commissioning and site acceptance
- Training, documentation and translation
- Spare parts and wear items for the first year
- Local service contract and remote support
- Currency conversion and bank charges
Duties, taxes and conformity
We do not quote duty or tax rates for Egypt here, because they depend on the exact classification, the origin of the equipment and any agreement in force. Standalone industrial robots are usually classified under HS 8479.50, while a complete cell may be classified by its principal function. Confirm the rate, import taxes and any conformity certificate with General Organization for Export and Import Control (GOEIC) and Egyptian Customs Authority and a licensed customs broker before you order, and add each as a separate line.
Costs that are specific to the site
Adapt the electrical design to the supply voltage and frequency at your plant before the cell is built, and budget for utilities, foundations and climate protection where heat, dust or humidity are a factor. Retrofitting after delivery is expensive.
Local support is part of the price
A cheaper overseas proposal can cost more over the life of the cell if every fault needs a technician to fly in. Price the response time, the spare parts held in Egypt or the region, and who carries out preventive maintenance.
How to use the framework
Send the same cost template to every shortlisted supplier, ask them to fill in what they provide and mark exclusions, then price the exclusions yourself. Our Robot Export hub at https://robot-export-global.lovable.app links to the sourcing guides for supplier countries, so you can compare options on the same basis.
Share your brief
If you are comparing suppliers or need a landed-cost template for a specific project, share a sourcing brief through the contact form below. We only reply with information we can stand behind.